Projects

OUR PROJECTS

Our Team Projects

Classification A Environmental Certificate for CAP

  • KSA
  • Environmental Certification
  • 2024
  • Riyadh
  • CAP - Environmental Solutions

MSWM Current Status Reports for all Saudi Arabian Municipalities

  • KSA
  • Waste Management
  • 2024
  • 17 Municipalities
  • CAP - Environmental Solutions + MOMRA

Environmental Impact Assessment Study (Environmental Study Form 2)? A plant for assembling metal components of the plate filter for industrial wastewater treatment plants

  • KSA
  • EIA, Industrial
  • 2023
  • Dammam
  • for Nova Industrial Development Company

Scope of Work: Participation in the field visit and general review of the study.

Environmental Impact Assessment Study (Environmental Study Form 2) for manufacturing ready-mix concrete, precast and pre-finished concrete products, and railway sleepers.

  • KSA
  • EIA, Industrial
  • 2023
  • Dammam.
  • the Concord Industrial Development Company project

Scope of Work: Participation in preparing laws and regulations, the current environmental status study, and coordinating with the Second Industrial City in Dammam.

Environmental Impact Assessment Study (Environmental Study Form “2”) for the establishment and operation of a factory for manufacturing cosmetics, detergents, and disinfectants

  • KSA
  • EIA, Industrial
  • 2022
  • Jeddah.
  • Happiness Cosmetics Company.

Scope of Work: Participation in preparing the environmental impact assessment and project alternatives, and coordination with the Second Industrial City in Jeddah.

Environmental Impact Assessment Study (Environmental Study Form 2) for the project to use 10% of fuel derived from refuse-derived fuel (RDF) as part of the total alternative fuel used by Zahran South Cement Company.

  • KSA
  • EIA, Industrial
  • 2022
  • Riyadh
  • Zahran South Cement Company.

Scope of Work: Participation in preparing the environmental impact assessment and project alternatives, and coordination with the factory.

Project to use 10% of fuel derived from refuse-derived fuel (RDF) as part of the total alternative fuel used ? Arabian Cement Factory ? Third Category.

  • KSA
  • Building Materials, Industrial
  • 2021
  • Arabian Cement Factory

Scope of Work: Participation in preparing the study.

Tender document for waste management E-platform

  • KSA
  • Waste Management
  • 2021
  • Assir
  • Assir Municipality

Environmental Impact Assessment Study ? Form (2) for Jotun Paints Factory in Dammam.

  • KSA
  • EIA, Industrial
  • 2020
  • Dammam.
  • Jotun Paints Factory

Scope of Work: Participation in preparing the study.

Environmental Impact Assessment Study ? Form (2) for the project of establishing a medical waste incinerator ? Al-Arabia Trading Company.

  • EIA, Waste Management
  • 2020
  • Al-Arabia Trading Company.

Scope of Work: Project management and implementation, general coordinator of the work team, and monitoring with the factory to respond to inquiries.

Environmental Impact Assessment Study ? Form (2) for the project of using waste oils as alternative fuel in kilns

  • KSA
  • Industrial
  • 2020
  • Arabian Cement Company

Scope of Work: Participation in preparing the study.

Environmental Study Form “2” for the project of the Saudi International Manufacturing Company (LLC) ? Ceramics, Rabigh.

  • KSA
  • Industrial
  • 2020
  • Rabigh
  • the Saudi International Manufacturing Company (LLC) ? Ceramics

Scope of Work: Project management and execution.

Environmental Study Form “2” for the project of a lighting unit assembly plant (Siraj Industrial Company).

  • Industrial
  • 2020
  • (Siraj Industrial Company).

Scope of Work: Participation in preparing the study.

Environmental Study Form (B?Specific) for the project of adding a filling line, loading dock, and underground diesel storage tank for the factory of the International Company for Trading and Manufacturing Building Materials ? (Jawharat Sinai Factory).

  • KSA
  • Building Materials, EIA
  • 2020
  • Jadda
  • the International Company for Trading and Manufacturing Building Materials ? (Jawharat Sinai Factory)

Scope of Work: Participation in preparing and implementing the study.

Environmental Study Form (3) for the Khafji Desalination Plant Project.

  • KSA
  • infrastructure
  • 2020
  • Khafji Desalination Plant Project.

Scope of Work: Participation in preparing the study and coordination of the work team.

Environmental Study Form for Al-Maasra Company for Engineering Industries (Factory 45 ? Military Production).

  • Egypt
  • Services
  • 2020
  • Cairo
  • Al-Maasra Company for Engineering Industries (Factory 45 ? Military Production).

Scope of Work: Participation in preparing the study.

Fleet management system

  • KSA
  • Smart Solution
  • 2020
  • Jeddah
  • CATEC

Environmental Impact Assessment Study ? Form (B?Specific) for Guardian Egypt (Egyptian Glass Company).

  • Egypt
  • Glass Industries
  • 2019
  • El-Sharqeya
  • Guardian Egypt (Egyptian Glass Company).

Scope of Work: Participation in preparing the study and coordination with the Egyptian Environmental Affairs Agency to respond to inquiries.

Environmental Impact Assessment Study ? Form (B?Specific) for the desalination plant project for the benefit of Petrobel (Belayim Petroleum Company).

  • Egypt
  • infrastructure
  • 2019
  • Cairo
  • the benefit of Petrobel (Belayim Petroleum Company).

Scope of Work: ribution to preparing the description of the proposed project

Environmental Impact Assessment Study ? Form (B?Specific) for the desalination plant project for the benefit of Belayim Petroleum Company (Petrobel).

  • Egypt
  • infrastructure
  • 2019
  • Cairo
  • Belayim Petroleum Company (Petrobel).

Scope of Work: Preparation of the Environmental Impact Assessment and the Environmental Management Plan within the study

Environmental Impact Assessment Study ? Form (B?Specific) for the grooming and utilization of Plot (3) of Al-Fanar Beach.

  • Egypt
  • Tourism
  • 2019
  • Sharm El-Sheikh
  • Al-Fanar Beach.

Scope of Work: Management and execution of the study

Environmental Impact Assessment Study “3” for the project of collecting and transporting mineral oils from all governorates to PetroTech Petroleum Services Company.

  • Egypt
  • Waste Management
  • 2019
  • Cairo
  • PetroTech Petroleum Services Company.

Scope of Work: Participation in preparing the study and contributing to the preparation for the Listening session.

Environmental Impact Assessment Study ? Form (B?Specific) for the project of transporting hazardous and non-hazardous waste from Greater Cairo to approved landfills ? Al Safa and Al Marwa Company.

  • KSA
  • Waste Management
  • 2019
  • Al Safa and Al Marwa Company.

Scope of Work: Management and execution of the study

Environmental Impact Assessment Study ? Form (B?Specific) for the project of transporting hazardous waste from Suez Governorate to the Al-Nasreya landfill in Alexandria (Global Company).

  • Egypt
  • Hazardous Waste Management
  • 2018
  • Suez
  • the Al-Nasreya landfill in Alexandria (Global Company).

Scope of Work: Management and execution of the study

Environmental Impact Assessment Study ? Form (B?Specific) for Tawkil Metal Industries Company (Yanbu).

  • KSA
  • Metal Industries
  • 2018
  • (Yanbu).
  • Tawkol Metal Industries Company

Scope of Work: Management and execution of the study.

Environmental Study Form (B) for the project of transporting ethylene and propane from the companies (ETHYDCO ? SIDPEC ? GASCO ? Egyptian Petrochemicals Company) to the Egyptian Liquefied Natural Gas Company (ELNG) via NOSCO.

  • Egypt
  • Oil & Gas
  • 2018
  • Cairo
  • Egyptian Liquefied Natural Gas Company (ELNG) via NOSCO.

Scope of Work: Management and execution of the study.

Environmental Impact Assessment Study ? Form (B?Specific) for the Bioavailability Laboratory and Pharmaceutical and Clinical Research Project ? Arab Company for Pharmaceutical Industries and Medical Supplies (ACDIMA).

  • Jordan
  • Pharmaceutical
  • 2018
  • Amman
  • Arab Company for Pharmaceutical Industries and Medical Supplies (ACDIMA).

Scope of Work: Management and execution of the study.

Environmental Impact Assessment Study ? Form (B?Specific) for the Arab International Group for Pharmaceuticals and Pharmaceutical Industries Company ? Tabuk.

  • KSA
  • Pharmaceutical
  • 2018
  • Tabuk.
  • Pharmaceuticals and Pharmaceutical Industries Company

Scope of Work: Management and implementation of the study

Phase II site assessment study for contaminated dump site for oily waste

  • KSA
  • Site Assessment
  • 2018
  • Rabigh city
  • AL Safwa Cement company

Mobile application

  • UAE
  • Smart Solution
  • 2018
  • Abu Dhabi
  • Al-Dhafra landfill

Environmental Impact Assessment Form (B?Specific) for the project of establishing and rehabilitating administrative, residential, and service buildings in the Gebel Qatrani area within Lake Qarun Protected Area.

  • Egypt
  • Tourism
  • 2018
  • Fayoum
  • Lake of Qaroun

Environmental Study Form “2” for the project of establishing a children’s water play area at Domina Coral Bay Village, Dammam.

  • KSA
  • Tourism
  • 2018
  • , Dammam.
  • Domina Coral Bay Village,

Scope of Work: Participation in preparing the study

Environmental Impact Assessment Study ? Form “C” for the project of using alternative fuel (shredded used tires, sludge, and used oils) at the Katameya Cement Plant ? Suez Cement Group.

  • Egypt
  • Waste Management
  • 2018
  • Cairo
  • the Katameya Cement Plant ? Suez Cement Group.

Scope of Work: Preparation of the study and general coordinator of the Lestining session.

Environmental Impact Assessment Study ? Form (B?Specific) for the project of transporting hazardous waste from Cairo Governorate to the Al-Nasreya landfill in Alexandria (Al-Saad Company).

  • Egypt
  • Waste Management
  • 2018
  • Cairo
  • (Al-Saad Company).

Scope of Work: Management and execution of the study.

Preparation of an Environmental Impact Assessment study for a sugar refinery

  • KSA
  • Industrial
  • 2015
  • Yanbu
  • Durrah Sugar Refinery Co.

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study

  • KSA
  • Tourism
  • 2015
  • Yanbu
  • Red Sea Cables Company

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for a construction project

  • KSA
  • Industrial
  • 2014
  • Jeddah city
  • Aqua Raffles five stars Hotel,

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for lubricating oils

  • KSA
  • Industrial
  • 2014
  • Yanbu
  • Al-Khorayef Company (a Saud

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for cement bricks

  • KSA
  • Construction
  • 2013
  • Yanbu
  • For Al-Namlah Cement Brick Factory

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for water desalination

  • KSA
  • Industrial
  • 2013
  • Jeddah
  • Kindasa for water desalination

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for fuel supply

  • KSA
  • EIA
  • 2012
  • Yanbu
  • Marafiq Yanbu (Yanbu Utilities)

Scope of Work: Management and execution of the study

Establishment of Hazardous/Medical waste Incinerator

  • KSA
  • Hazardous Waste Management, Waste Management
  • 2012
  • Jeddah
  • SEPCO

Lining for Juhfa Industrial Landfill/Complex

  • KSA
  • Industrial, Waste Management
  • 2012
  • Rabigh
  • SEPCO

Preparation of an Environmental Impact Assessment study for insulating materials

  • KSA
  • Water Desalination
  • 2012
  • Rabigh
  • Al-Oula Saudi Company for Insulating Materials

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for Yanbu 2 desalination

  • KSA
  • Water Desalination
  • 2012
  • Yanbu
  • Yanbu 2 Desalination Plant

Scope of Work: Management and execution of the study

Preparation of an Environmental Impact Assessment study for the rehabilitation and expansion of the wastewater treatment plant

  • KSA
  • EIA, Wastewater
  • 2011
  • Yanbu
  • Marafiq Company

Scope of Work: Management and execution of the study

Environmental Impact Assessment study for the expansion of STG 5&6 desalination plant

  • KSA
  • EIA, Industrial, Water Desalination
  • 2010
  • Yanbu
  • At Maratfaq Yanbu Company

Scope of Work: Management and execution of the study

Environmental Impact Assessment study for the Al-Oyoun landfill closure project

  • KSA
  • Waste Management
  • 2010
  • In Al-Ahsa Governorate
  • Al-Oyoun

Scope of Work: Management and execution of the study

Environmental Impact Assessment study for the Al-Omran landfill closure project

  • KSA
  • Waste Management
  • 2010
  • In Al-Ahsa Governorate
  • Al-Omran

Scope of Work: Management and execution of the study

Environmental assessment and monitoring study for Al-Misk Lake

  • KSA
  • Environmental Study & Monitoring
  • 2009
  • Jeddah ? Asla Valley
  • Al-Misk Lake

Scope of Work: Management and execution of the study